Systems / Manufacturing
MFG

Manufacturing, production orders and disassembly

From the bill of materials to finished-goods cost.

From the inside

Manufacturing

Bills of materials with scrap % per material

From the bill of materials to finished-goods cost.

  • ✓Bills of materials with scrap % per material
  • ✓Work centers and routing steps
  • ✓Full or light production orders
  • ✓Quantity, price and efficiency variance report

Screens from inside the system

Click any picture to enlarge it · A screenshot from a trial company with sample data, not customer data.

For factories and workshops: define each product's components and operations, issue a production order, issue materials, receive the finished product and see its actual cost against standard. If you buy one material and break it into parts, disassembly has its own document.

Bills of material and routing

Define the product, its materials and steps.

  • ✓A BOM with a scrap rate per material
  • ✓Work centers and operations with hours and rates
  • ✓A lite order that starts from the BOM for small shops

Production orders and costing

Issue materials, receive product, get unit cost.

  • ✓Issue materials and load hours
  • ✓Receive finished goods with scrap quantity
  • ✓Order expenses with a simple entry, included in unit cost
  • ✓Dual quantity by count and weight

Variances and scrap

Compare actual with standard.

  • ✓Quantity and price variance
  • ✓Labor and overhead efficiency
  • ✓Allowed versus actual scrap

Disassembly and cutting

One or more raw inputs become products and waste.

  • ✓One document with several raw inputs
  • ✓Cost shared by sales value, weight, quantity or a fixed percentage
  • ✓Products plus waste cannot weigh more than the inputs
  • ✓Posts in one step: raw issue, cost entry and product receipt

Frequently asked questions

Is it suitable for small workshops?

Yes. A lite production order starts from the BOM with fewer steps.

What is the difference between production and disassembly?

Production combines materials into a product; disassembly splits a material into several products and waste.

Ready to start? Your plan is minutes away

Pick a plan and try the system free.